Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorÇolak, Murat
dc.contributor.authorKeskin, Gülsen Aydın
dc.date.accessioned2022-03-28T13:08:49Z
dc.date.available2022-03-28T13:08:49Z
dc.date.issued2021en_US
dc.identifier.issn1923-2926 -1923-2934
dc.identifier.urihttps://doi.org/10.5267/j.ijiec.2021.12.001
dc.identifier.urihttps://hdl.handle.net/20.500.12462/12149
dc.descriptionKeskin, Gülsen Aydın (Balikesir Author)en_US
dc.description.abstractHybrid flowshop scheduling problem (HFSP) is a mixture of two classical scheduling problems as parallel machine scheduling (PMS) and flowshop scheduling (FS). In the HFSP, a series of jobs are processed respectively in a set of stages that at least one of these stages has more than one parallel machine (identical, uniform or unrelated). HFSP is a widespreadly studied subject in the literature and there are various application areas such as transportation, healthcare management, agricultural activities, cloud computing, and the most common manufacturing. Therefore, it will be useful to present a review study including recent papers and developments related to this problem for researchers. For this aim, in this paper, a systematic literature survey has been conducted with respect to HFSPs by means of Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) methodology which enables to realize systematic review and meta-analyses in a specified subject. 172 articles which are published in the 2010-2020 year interval, related to production scheduling and including a mathematical programming model to express scheduling problems have been determined as a result of this methodological review process. These articles have been statistically analyzed according to many features such as year, country, journal, number of stages, type of parallel machines, constraints, objective functions, solution methods, test instances and type of parameters. The results of statistical analyses have been presented through charts so as to provide a visual demonstration to researchers. Furthermore, it has been aimed to answer 14 predetermined research questions by means of analyses realized in the scope of this review study. Consequently, it has revealed the existing literature, recent developments and future research suggestions related to HFSP and therefore it is possible to say that this review paper provides a beneficial road map for researchers studying in this field. (c) 2022 by the authors; licensee Growing Science, Canadaen_US
dc.language.isoengen_US
dc.publisherGrowing Scienceen_US
dc.relation.isversionof10.5267/j.ijiec.2021.12.001en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectHybrid Flowshopen_US
dc.subjectProduction Schedulingen_US
dc.subjectLiterature Reviewen_US
dc.subjectPRISMAen_US
dc.titleAn extensive and systematic literature review for hybrid flowshop scheduling problemsen_US
dc.typearticleen_US
dc.relation.journalInternational Journal of Industrial Engineering Computationsen_US
dc.contributor.departmentMühendislik Fakültesien_US
dc.contributor.authorID0000-0001-6639-1882en_US
dc.identifier.volume13en_US
dc.identifier.issue2en_US
dc.identifier.startpage185en_US
dc.identifier.endpage222en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster