Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorCoşkun, Can
dc.contributor.authorOktay, Zuhal
dc.contributor.authorDinçer, İbrahim
dc.date.accessioned2019-10-16T11:28:35Z
dc.date.available2019-10-16T11:28:35Z
dc.date.issued2011en_US
dc.identifier.issn0360-5442
dc.identifier.urihttps://doi.org/10.1016/j.energy.2011.09.038
dc.identifier.urihttps://hdl.handle.net/20.500.12462/7096
dc.descriptionCoşkun, Can (Balıkesir Author)en_US
dc.description.abstractIn this study, a modified exergoeconomic model is proposed for geothermal power plants using exergy and cost accounting analyses, and a case study is in this regard presented for the Tuzla geothermal power plant system (Tuzla GPPS) in Turkey to illustrate an application of the currently modified exergoeconomic model. Tuzla GPPS has a total installed capacity of 7.5 MW and was recently put into operation. Electricity is generated using a binary cycle. In the analysis, the actual system data are used to assess the power plant system performance through both energy and exergy efficiencies, exergy losses and loss cost rates. Exergy efficiency values vary between 35% and 49% with an average exergy efficiency of 45.2%. The relations between the capital costs and the exergetic loss/destruction for the system components are studied. Six new exergetic cost parameters, e.g., the component annualized cost rate, exergy balance cost, overall unavoidable system exergy destruction/loss cost rate, overall unavoidable system exergy destruction/loss cost rate, overall unavoidable system exergy production cost rate and the overall unavoidable system exergy production cost rate are studied to provide a more comprehensive evaluation of the system.en_US
dc.language.isoengen_US
dc.publisherPergamon-Elsevier Science Ltden_US
dc.relation.isversionof10.1016/j.energy.2011.09.038en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectGeothermal Energyen_US
dc.subjectGeothermal Power Planten_US
dc.subjectExergyen_US
dc.subjectCosten_US
dc.subjectExergoeconomicsen_US
dc.titleModified exergoeconomic modeling of geothermal power plantsen_US
dc.typearticleen_US
dc.relation.journalEnergyen_US
dc.contributor.departmentMühendislik Mimarlık Fakültesien_US
dc.contributor.authorID0000-0001-6167-7048en_US
dc.contributor.authorID0000-0003-4100-0296en_US
dc.identifier.volume36en_US
dc.identifier.issue11en_US
dc.identifier.startpage6358en_US
dc.identifier.endpage6366en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster