Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorDuman, Mehmet Volkan
dc.contributor.authorÖzmetin, Elif
dc.date.accessioned2019-10-17T11:09:19Z
dc.date.available2019-10-17T11:09:19Z
dc.date.issued2014en_US
dc.identifier.issn1758-2083
dc.identifier.issn1758-2091
dc.identifier.urihttps://doi.org/10.1504/IJGW.2014.061019
dc.identifier.urihttps://hdl.handle.net/20.500.12462/8474
dc.descriptionÖzmetin, Elif (Balikesir Author)en_US
dc.description.abstractIn this study, the base water originating in Simav Open Pit Mine containing the most important reserves of colemanite and ulexite boron minerals, has a boron concentration of 150 +/- 50 mg/L, was treated to maximum 2 mg/L with the help of pilot RO system which was designed with two-phase reverse osmosis system. This system was designed and produced by Italian GEL Company. Temperature, pH, pressure and inlet boron concentration were chosen as research parameters in this study and influences of these parameters were analysed. According to the results of test periods; the efficiency of boron removal increases with increasing inlet pH and inlet pressure; the efficiency of boron removal decreases with increasing inlet temperature and inlet boron concentration. According to the economical analysis delivered during research period, the cost of 1 m(3) treated water is 1.21 (Sic) in 2010, the result for the year 2011 is 1.28 (Sic). According to the cost analysis of the plant over years, energy and caustic consumptions took the biggest parts; it was concluded that the percentage of caustic consumption was 25.93 and the energy consumption was 22.11 in 2010; the percentage of caustic consumption is 21.92 and the energy consumption is 28.40 in 2011.en_US
dc.language.isoengen_US
dc.publisherInderscience Enterprises Ltden_US
dc.relation.isversionof10.1504/IJGW.2014.061019en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectBoron Removalen_US
dc.subjectReverse Osmosisen_US
dc.subjectEconomical Analysisen_US
dc.subjectHigh pH Operationen_US
dc.subjectOpen Pit Mineen_US
dc.subjectWaste Wateren_US
dc.titleBoron removal from waste water originating in the open pit mines of Bigadic Boron Work by means of reverse osmosisen_US
dc.typearticleen_US
dc.relation.journalInternational Journal of Global Warmingen_US
dc.contributor.departmentMühendislik Mimarlık Fakültesien_US
dc.identifier.volume6en_US
dc.identifier.issue2-3en_US
dc.identifier.startpage252en_US
dc.identifier.endpage269en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster